Wednesday, May 12, 2010

Pikor. Leon

General Contractor 6643 west Olympic Blvd. Los Angeles CA 90048

Office 310-487-4319

Leon Pikor. Meena P atel

_____________________________________________________________________________

Meena Patel

Remodel and Paint

2137 Linda Flora Dr.

Los Angeles, CA 90077

"Vision, Finance, TeamWork"

CONFIDENTIAL FOR INTERNAL USE ONLY

May 12, 2010

Under Development By:

Leon Pikor & Meena Patel

Leon Pikor tel. 310-487-4319 Page 2

Meena Patel Remodel

Table of Contents

1.0 Document History

2.0 Brief Overview & Project Goals

3.0 Project Milestones & Estimated Costs

4.0 Totaled Costs

5.0 Notes

1.0 Document History

Version Date Author Comment Authorization

1.0 May 11, 2010 Jimmy

Lauria/Martin

Valdez

Proposal

combo

3.0 May 11, 2010 Jimmy

Lauria/Martin

Valdez

Revisions

based on

onsite meeting

at the project

property on

05/11/2010.

estimate.

Jimmy Lauria tel. 818-519-3585 Page 3

House Project

2.0 Brief Overview & Project Goals

Goals & Objectives

This estimate document has been prepared based on site meeting with Meena Patel on

05/11/2010 & teleconference call & on site meeting on 05/11/2010.

3.0 Project Milestones & Estimated Costs

MILESTONE 1 – Kitchen

Site Preparation, Layout,


 

$ 780.00 Glass Cabinet doors 6. Total

MILESTONE 2 – FRAMING Window, Door

$740.00 Framing and finish

$ 530.00 Rough and finish frameless shower door install.

MILESTONE 3 – under cabinet lighting. LED or Halogen. Labor only.

$400.00

Increase backsplash 4" Labor only. $175.00

MILESTONE 4 – REPAIR DRYWALL & PANT

Study office one wall. Tape drywall

Install drywall mud/compound

Apply 20 minute on drywall & sand surfaces, paint

$360.00

MILESTONE 5 – EXTERIOR PAINTING SIDING

Paint Exterior. Remove dry rot wood, pressure wash, prime and paint front. $2,734.00 other 3 Sides paint $2.142.00

Paint exterior Fascia $1,395.00 windows require prime, painting in front 10 for $750.00

ADDITIONAL ITEMS TO BE ESTIMATED ONCE DESIGN DECISIONS COMPLETE

House Project

4.0 Totaled Costs

Total Itemized Labor costs from section 3.0 (Project Milestones & Estimated

Costs) shown above


 

Leon Pikor Contractor Fees/Profit

$1,258.00

House Project

5.0 Notes Page

Notes