Wednesday, September 8, 2010

Engineering LA. NY. Chgo. USA Pikor, Leon ACE. 1310-487-4319

Leon Pikor Structural & civil engineering

137 South Robertson Boulevard, suite # 119, Beverly hills, ca 90211

Office 310-487-4319 Leon Pikor


 

Structural & Civil Engineering Design & Consulting Services

Type of Projects - Structural & Civil Business sectors

Mixed use & Multi Family transportation

Office Buildings food & beverage/restaurants

Subterranean Structures education

Tenant Improvement commercial/residential

Masonry Building rehabilitation municipal

Industrial fabrication plants government

Commercial Retail institutional

Churches health care

Warehouses industrial

Ocean Front Development planning

Manufacturing Facilities sanitation

Bridges

Nuclear Power Plants-(Enricofermi - Detroit Mi, Niagra Mohawk - Ny)

Structural engineering

Brace/Moment Frames concrete pre-cast

Seismic Design structural steel

Structural Plans & Calculations retaining walls

Hillside Swimming Pools grade beams

Interior Structural Reconfigurations framing, roofing & shear wall design

Friction Piles/Caissons structural inspections & observations

Foundation Plans seismic retrofits

Post Tension concrete

Civil engineering

grading

shoring

utilities

roads

drainage

soil erosion

storm drain

sump pump

Wednesday, May 12, 2010

Pikor. Leon

General Contractor 6643 west Olympic Blvd. Los Angeles CA 90048

Office 310-487-4319

Leon Pikor. Meena P atel

_____________________________________________________________________________

Meena Patel

Remodel and Paint

2137 Linda Flora Dr.

Los Angeles, CA 90077

"Vision, Finance, TeamWork"

CONFIDENTIAL FOR INTERNAL USE ONLY

May 12, 2010

Under Development By:

Leon Pikor & Meena Patel

Leon Pikor tel. 310-487-4319 Page 2

Meena Patel Remodel

Table of Contents

1.0 Document History

2.0 Brief Overview & Project Goals

3.0 Project Milestones & Estimated Costs

4.0 Totaled Costs

5.0 Notes

1.0 Document History

Version Date Author Comment Authorization

1.0 May 11, 2010 Jimmy

Lauria/Martin

Valdez

Proposal

combo

3.0 May 11, 2010 Jimmy

Lauria/Martin

Valdez

Revisions

based on

onsite meeting

at the project

property on

05/11/2010.

estimate.

Jimmy Lauria tel. 818-519-3585 Page 3

House Project

2.0 Brief Overview & Project Goals

Goals & Objectives

This estimate document has been prepared based on site meeting with Meena Patel on

05/11/2010 & teleconference call & on site meeting on 05/11/2010.

3.0 Project Milestones & Estimated Costs

MILESTONE 1 – Kitchen

Site Preparation, Layout,


 

$ 780.00 Glass Cabinet doors 6. Total

MILESTONE 2 – FRAMING Window, Door

$740.00 Framing and finish

$ 530.00 Rough and finish frameless shower door install.

MILESTONE 3 – under cabinet lighting. LED or Halogen. Labor only.

$400.00

Increase backsplash 4" Labor only. $175.00

MILESTONE 4 – REPAIR DRYWALL & PANT

Study office one wall. Tape drywall

Install drywall mud/compound

Apply 20 minute on drywall & sand surfaces, paint

$360.00

MILESTONE 5 – EXTERIOR PAINTING SIDING

Paint Exterior. Remove dry rot wood, pressure wash, prime and paint front. $2,734.00 other 3 Sides paint $2.142.00

Paint exterior Fascia $1,395.00 windows require prime, painting in front 10 for $750.00

ADDITIONAL ITEMS TO BE ESTIMATED ONCE DESIGN DECISIONS COMPLETE

House Project

4.0 Totaled Costs

Total Itemized Labor costs from section 3.0 (Project Milestones & Estimated

Costs) shown above


 

Leon Pikor Contractor Fees/Profit

$1,258.00

House Project

5.0 Notes Page

Notes